Air Conditioning Installation for Basingstoke Chemicals Company

An existing client of New-Air required additional laboratory areas to be constructed at their premises. We had already successfully installed a number of air conditioning systems within various areas and were employed by the client to condition a further two areas. The laboratory areas presented limited options for the installation of internal units due to shelving and low level storage on the perimeter walls and a plasterboard ceiling with surface mounted lighting modules. We carried out detailed heat gain calculations to include a review of each environments heat loads taking into consideration a number of factors such as electrical loads, solar / fabric gains and occupancy. A report was presented to our clients and we selected under ceiling type fan...
Read More