Case Studies

Air conditioning and ventilation to clients new premises

Air conditioning and ventilation to clients new premises

New-Air are in the process of installing a number of air conditioning and ventilation systems to an existing clients new premises. Due to business expansion our client is relocating to a new premises with both office and laboratory environments which require heating, cooling and ventilation. The new premises had a packaged air handling unit installed which provided conditioned air to a large scale open plan area and operated on a common temperature set point throughout.  Due to our clients requirements they are partitioning the open plan area to contain the various business activities. They required individual temperature control within each area and the laboratory areas required high efficiency filtration to prevent contamination.  In order to meet their requirements we are installing equipment...

Read More

Heat Recovery Ventilation at Southampton Hospital

Heat Recovery Ventilation at Southampton Hospital

New-Air were approached by a builder who had been employed to convert an existing stores area into a new office for a total of ten personnel within a hospital building.  The office had no openable windows and therefore an energy efficient heat recovery fresh air system was installed to meet current fresh air requirements within an occupied office environment.  The system provides the occupants with clean, fresh air and therefore improved air quality and comfort within the area. Heat recovery ventilation systems provide effective fresh air ventilation with highly efficient heat recovery which means that any exhausted cooling / heating energy is recovered back into the office environment. Control of the system is via a wall mounted controller complete with...

Read More