Case Studies

New Chiller for Hampshire Hospital Operating Theatre

New Chiller for Hampshire Hospital Operating Theatre

New-Air successfully installed a replacement chiller serving a Hampshire hospital operating theatre.  Due to the critical nature of the area the work needed to be coordinated to enable the operating theatres to run seamlessly. As a result; the project was completed in one day over a weekend.  As part of the project we supplied a temporary chiller which was coupled to the existing chilled water pipe work with a quick turn around which prevented any down time whilst the new chiller was being manufactured. New-Air coordinated a contracted crane lift to crane the existing unit to grade and the new Lennox chiller was lifted to the roof area and sited upon the existing supports. The chilled water pipe services were...

Read More

Out with the old R22 in with the New-Air conditioning

Out with the old R22 in with the New-Air conditioning

Our client decided to take action and replace their old R22 air conditioning systems.  The new systems offer a range of benefits to include energy efficient inverter technology resulting in  savings on operating costs, quieter operation and an extended warranty to name a few.  R22 refrigerant was banned for use at the end of 2014 and as a result, sites that continue to operate their old systems will experience increased operational costs.  There are limited options when it comes to servicing these system in the event of a failure and in most cases the most cost effective solution is to replace the equipment. We were able to replace the existing equipment on our clients site whilst retaining the interconnecting services within the...

Read More

Air conditioning and ventilation to clients new premises

Air conditioning and ventilation to clients new premises

New-Air are in the process of installing a number of air conditioning and ventilation systems to an existing clients new premises. Due to business expansion our client is relocating to a new premises with both office and laboratory environments which require heating, cooling and ventilation. The new premises had a packaged air handling unit installed which provided conditioned air to a large scale open plan area and operated on a common temperature set point throughout.  Due to our clients requirements they are partitioning the open plan area to contain the various business activities. They required individual temperature control within each area and the laboratory areas required high efficiency filtration to prevent contamination.  In order to meet their requirements we are installing equipment...

Read More